Monday, April 25, 2011

Spring work day set for May 21 at Immanuel

Time to roll up your sleeves and get the job done at Immanuel!

A spring work day is set for 8:30 a.m. to 2 p.m. Saturday, May 21, with lunch provided.

Items on the to-do list include a range of tasks, some of which require more energy than skill.

Here’s what’s planned:

  • Flower bed clean up
  • Spread mulch
  • Clean gutters, windows
  • Interior painting: walls, ceiling tiles
  • Exterior painting: doors, window
  • Caulk exterior windows

Sign up on the bulletin board if you’re interested in lending a hand.