Time to roll up your sleeves and get the job done at Immanuel!
A spring work day is set for 8:30 a.m. to 2 p.m. Saturday, May 21, with lunch provided.
Items on the to-do list include a range of tasks, some of which require more energy than skill.
Here’s what’s planned:
- Flower bed clean up
- Spread mulch
- Clean gutters, windows
- Interior painting: walls, ceiling tiles
- Exterior painting: doors, window
- Caulk exterior windows
Sign up on the bulletin board if you’re interested in lending a hand.